Non-statutory consultation is now closed

Ossian’s latest round of public consultation closed on Sunday 13th of April 2025. The consultation materials from this period are available to view or download by visiting our documents page here.

The team would like to say thank you to everyone who provided feedback on our proposals.

All the feedback that we have received is carefully considered and will be reviewed and summarised in an end of consultation summary report. A further round of public consultation will take place later in 2025.

Non-statutory consultations provide local communities, stakeholders and other interested parties the opportunity to engage with the Ossian project team early in the planning process. The feedback collected during the non-statutory consultation will inform the design and development of the project.

Consultation events

In person events were held in 6 locations:

Date Time Venue
Thursday 20 March 2025 3pm - 7pm Anderby Village Hall, Sea Road, Anderby, Skegness, PE24 5YD
Friday 21 March 2025 3pm - 7pm Sibsey Village Hall, 28 Frithville Road, Boston, PE22 0SR
Saturday 22 March 2025 9am - 12pm Spilsby Franklin Hall, Halton Road, Spilsby, PE23 5LA
Thursday 27 March 2025 3pm - 7pm Weston Village Hall, Small Drove, Weston, Spalding, PE12 6HU
Friday 28 March 2025 3pm - 7pm Alford Corn Exchange, 9 Market Place, Alford, LN13 9EB
Saturday 29 March 2025 9am - 12pm Fosdyke Village Hall, Old Main Road, Fosdyke, Boston, PE20 2BU

We hosted a webinar from 6pm – 7pm on Wednesday 02 April 2025 on Zoom. You can view a recording of the webinar by clicking here.

What we consulted on?

We sought views and feedback on the following areas as part of the non-statutory consultation period.

Offshore transmission infrastructure

  • Offshore cables from the wind farm array to landfall.

Landfall

  • Where the Offshore cables are brought ashore and jointed to the Onshore Cables

Onshore transmission infrastructure

  • Onshore cables from the landfall to onshore converter stations.
  • One converter station at the Lincolnshire Connection Node; and
  • Two converter stations at Weston Marsh.
  • Onshore cables between onshore converter stations and the points of connection to the National Grid.

Onshore cables will be installed below ground along this corridor. No overhead lines are being proposed as part of the Ossian Transmission Infrastructure. We expect these cables to be installed using open trenching techniques, with trenchless techniques such as horizontal directional drilling, being employed where the route crosses features such as major roads or watercourses and/or environmentally sensitive areas.

Consultation materials

The materials that we presented as the non-statutory consultation are available for download at the individual links below or by clicking the ‘View documents’ button.

How to get in touch

You can get in touch with the team on:

Email: [email protected]

Phone: 0800 138 5407 (this number is free from a landline, other network providers may charge and is manned from 9am to 5pm, Monday to Friday).

Next steps

The feedback we have received during our non-statutory consultation period will help inform our proposals as they evolve. We are planning to hold further stages of public consultation later this year, before the onshore application for Development Consent Order is submitted in 2026. You can register for updates here.